Bass Lake Road Corridor

Brooklyn Center, MN

I was hired as a sub-consultant by SEH, Inc. to develop the landscape plan and construction documents for streetscape and regional trail improvements along Bass Lake Road. The redevelopment of Bass Lake Road between Brooklyn Blvd. and Highway 100 addressed stormwater runoff by pitching water towards the medians, capturing it in swales and filtering it through a series of rain gardens. Connections were made to the Three Rivers Park Regional Trail system and street furniture was placed at bus stop locations and plazas along the route.

Project extents